Use of this manual shall result in meeting the primary objective of providing environmental comfort to veterans, employees, and visitors. The HVAC system shall be:
• Technically correct, complete, and coordinated
• In compliance with all applicable safety standards
• Easily accessible for repairs and maintenance
• Energy efficient
• In compliance with prescribed noise and vibration levels
Deviations from this manual may be proposed to promote new concepts and design enhancements. Deviations shall not conflict with Federal Regulations, Public Laws, Executive Orders, or the needs of the end users. Any deviations are subject to review and written approval by the VA Project Manager in consultation with VA Consulting Support Service. For projects designed and contracted by the Office of Construction and Facilities Management, the VA Project Manager is the VA Authority. Interfacing with the VA Medical Center shall be through the VA Project Manager or his/her assigned individuals.
Contents
CHAPTER 1: HVAC DESIGN MANUAL
1.1 INTRODUCTION
1.2 COMPLIANCE
1.3 ENERGY CONSERVATION
1.3.1 ASHRAE STANDARD 90.1 – 2007
1.3.2 ASHRAE STANDARD 90.1 – 2010
1.4 MANDATED ENERGY CONSERVATION MEASURES
1.4.1 LIFE-CYCLE COST ANALYSIS – REQUIREMENTS
1.4.2 LIFE-CYCLE COST ANALYSIS – METHODOLOGY
1.4.3 ENERGY REDUCTION REQUIREMENT – NEW CONSTRUCTION
1.4.4 ENERGY REDUCTION REQUIREMENT – MAJOR RENOVATIONS
1.4.5 VA POLICY
1.4.5.1 Certification
1.5 MEASUREMENT AND VERIFICATION
1.6 ABBREVIATIONS AND REFERENCES
1.7 COMMISSIONING
1.8 VA STANDARDS
1.8.1 DESIGN MANUAL (by discipline) (PG-18-10)
1.8.2 MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS (PG-18-15)
1.8.3 MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1)
1.8.4 ARCHITECT ENGINEER REVIEW CHECKLIST
1.8.5 DESIGN ALERTS
1.8.6 A/E QUALITY ALERTS
1.8.7 DESIGN GUIDES (graphical, by function) (PG-18-12)
1.8.8 DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
1.8.9 STANDARD DETAIL AND CAD STANDARDS (PG-18-4)
1.8.10 PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES – MISSION
CRITICAL FACILITIES AND LIFE SAFETY PROTECTED FACILITIES
(FORMERLY CD-54)
1.8.11 COST ESTIMATING MANUAL
1.8.12 SUSTAINABLE DESIGN AND ENERGY REDUCTION MANUAL
1.8.13 SEISMIC DESIGN REQUIREMENTS (STRUCTURAL) (H-18-18)
1.8.14 FIRE PROTECTION DESIGN MANUAL
1.8.15 BUILDING INFORMATION MODEL (BIM) GUIDE
1.9 VA HOSPITAL BUILDING SYSTEM
1.10 COMPUTER AIDED FACILITIES MANAGEMENT (CAFM)
1.10.1 CAFM AND EQUIPMENT SCHEDULE UTILIZATION
1.10.1.1 Introduction
1.11 HVAC DESIGN MANUAL AND A/E SUBMISSION REQUIREMENTS
(PG-18-15)
1.11.1 COORDINATION
1.11.2 COMPLIANCE REQUIREMENTS
1.11.3 EQUIPMENT SCHEDULES
1.11.3.1 Order of Presentation
1.11.3.2 Equipment Capacity and Performance Data Requirements
1.11.3.3 Equipment Schedules – Glycol Data
APPENDIX 1-A: VA HOSPITAL BUILDING SYSTEM
HVAC DESIGN MANUAL 2011
CHAPTER 2: HVAC DESIGN PARAMETERS AND SELECTION CRITERIA
2.1 INTRODUCTION
2.2 BASIS OF DESIGN
2.2.1 OUTDOOR DESIGN CONDITIONS
2.2.1.1 Cooling and Heating Load Calculations
2.2.1.2 Cooling Tower Selection
2.2.1.3 Preheat Coil Selection
2.2.1.4 Electrical Heating Devices Using Emergency Power
2.2.2 INDOOR DESIGN CONDITIONS
2.2.2.1 Indoor Minimum Relative Humidity
2.2.3 COOLING AND HEATING LOAD CALCULATIONS – PARAMETERS
2.2.3.1 Occupancy
2.2.3.2 Light and Power Loads
2.2.3.3 Building Thermal Envelope
2.2.3.4 Outdoor Air For Ventilation (Calculation Requirements)
2.2.4 COOLING AND HEATING LOAD CALCULATIONS
2.2.4.1 Room Data Output
2.2.4.2 AHU Peak Cooling Load
2.2.4.3 AHU Peak Supply Air Volume
2.2.4.4 AHU Supply Air Volume and Duct Leakage Factor 5
2.2.4.5 Psychrometric Analysis
2.2.4.6 Building Peak Cooling Load
2.2.5 ROOM TEMPERATURE CONTROLS
2.2.5.1 Definition
2.2.5.2 Individually Temperature Controlled Spaces
2.2.5.3 Group Temperature Control
2.2.5.4 Open Spaces
2.2.6 PERIMETER HEATING
2.2.6.1 General
2.2.6.2 Heating System Description
2.2.6.3 Heating Medium
2.3 SPECIAL STUDIES
2.3.1 ACOUSTIC ANALYSIS
2.3.1.1 General
2.3.1.2 Acoustic Mitigation Measures – HVAC Systems (Not including
Cooling Towers)
2.3.1.3 Acoustic Mitigation Measures – Cooling Towers
2.3.1.4 Unitary Equipment
2.3.2 DISPERSION ANALYSIS
2.3.2.1 General
2.3.2.2 Scope of Work
2.4 BUILDING THERMAL ENVELOPE (EXISTING FACILITIES ONLY)
2.5 BUILDING THERMAL ENVELOPE (NEW FACILITIES)
2.6 VIBRATION CONTROL
2.7 SEISMIC REQUIREMENTS
2.7.1 GENERAL
2.7.2 EXCEPTIONS
2.7.3 CONFORMANCE WITH SMACNA
2.7.4 CALCULATIONS
2.7.5 DRAWINGS
2.7.5.1 General
2.7.5.2 Ductwork and Piping Plans and Sections
2.7.5.3 Equipment Restraints
2.8 FIRE AND SMOKE PROTECTION
2.8.1 COMPLIANCE
2.8.2 EQUIPMENT AND CRITERIA
2.8.2.1 Smoke Dampers and Detectors
2.8.2.2 Fire Dampers
2.8.2.3 Stair Pressurization
2.8.2.4 Engineered Smoke Control System
2.8.2.5 Atrium Smoke Control System
2.8.2.6 Elevator Shaft Venting
2.9 DESIGN CONSIDERATIONS FOR EXISTING BUILDINGS
2.9.1 SITE SURVEY
2.9.1.1 Site Visits
2.9.1.2 Field Survey Report
2.9.1.3 Additional Work
2.9.2 MODIFICATIONS – EXISTING SYSTEMS
2.9.2.1 Steam Radiators
2.9.2.2 DDC Controls
2.9.2.3 Existing Ductwork
2.9.2.4 Refrigerant Removal
2.10 PROJECT PLANNING
2.10.1 PHASING
2.10.2 UTILITY CONNECTIONS AND OUTAGES
2.11 DEMOLITION WORK
2.12 LOCATIONS OF OUTDOOR AIR INTAKES AND EXHAUST AIR OUTLETS
2.12.1 COMPLIANCE – PHYSICAL SECURITY
2.12.2 GENERAL
2.12.3 COMMON OUTDOOR AIR INTAKE
2.13 BID PACKAGE COORDINATION
CHAPTER 3: AIRSIDE HVAC SYSTEMS AND EQUIPMENT
3.1 INTRODUCTION
3.2 ALL-AIR SYSTEMS
3.2.1 SPECIAL REQUIREMENTS
3.2.1.1 System Selection
3.2.1.2 Maximum Capacity
3.2.1.3 AHU Configuration
3.2.1.4 Rooftop Air-Handling Units
3.2.1.5 Supply Air Fan Selection
3.2.1.6 Air Distribution
3.2.1.7 Glycol
3.2.2 ALL-AIR SYSTEM COMPONENTS
3.2.2.1 Supply Air Fan(s)
3.2.2.2 Return Air Fan(s
3.2.2.3 Exhaust Fan(s)
3.2.2.4 Motor Voltages
3.2.2.5 AHU Casing
3.2.2.6 Access Sections and Mixing Box
3.2.2.7 Blender Section
3.2.2.8 Drain Pan
3.2.2.9 Cooling Coils
3.2.2.10 Preheat Coils
3.2.2.11 Unit-Mounted Reheat Coils
3.2.2.12 Corrosion Protection – Coils
3.2.2.13 Filtration
3.2.2.14 Humidifiers – Steam
3.2.2.15 Humidifiers – Gas-Fired
3.2.3 ALL-AIR SYSTEM – TYPES
3.2.3.1 Variable Air Volume (VAV) Systems
3.2.3.2 Constant Volume (CV) Systems
3.2.3.3 Air Terminal Units
3.3 TERMINAL COOLING AND HEATING SYSTEMS
3.3.1 SPECIAL REQUIREMENTS
3.3.1.1 Terminal Cooling Systems
3.3.1.2 DX Terminal Units
3.3.1.3 Fan Coil Units
3.3.1.4 Minimum Ventilation Air
3.3.1.5 Minimum Ventilation Air-Handling Units (100% Outdoor Air)
3.3.2 FAN COIL UNITS – SYSTEM DESCRIPTION
3.3.2.1 System Applications
3.3.2.2 Cooling Coil Condensate Piping
3.3.2.3 Filtration
3.3.2.4 Acoustic Measures
3.3.2.5 Controls
3.4 HEATING AND VENTILATION UNITS (HVU)
3.4.1 DESIGN PARAMETERS
3.4.1.1 Total Air Changes per Hour
3.4.1.2 Heating Mode
3.4.2 CENTRAL VENTILATION AND/OR HEATING SYSTEM
3.4.3 SPLIT-FUNCTION OR SEPARATE HEATING AND VENTILATION
SYSTEM
3.5 SUPPLY AIR OUTLETS
3.6 HEAT RECOVERY SYSTEMS
3.6.1 SENSIBLE HEAT TRANSFER
3.6.1.1 Runaround System
3.6.1.2 Fixed-Plate System (Air-to-Air)
3.6.1.3 Heat Pipes
3.6.1.4 Heat Wheel
3.6.2 SENSIBLE AND LATENT HEAT TRANSFER
3.6.2.1 Desiccant (Enthalpy) Heat Wheels
3.6.3 LOAD CREDIT
3.6.4 EXCEPTIONS – HEAT RECOVERY EQUIPMENT
3.7 EXHAUST SYSTEMS
3.7.1 GENERAL EXHAUST SYSTEM
3.7.1.1 Applications – Individual Spaces
3.7.1.2 Applications – Air-Handling Unit Systems
3.7.2 SPECIAL EXHAUST SYSTEM – APPLICATIONS
3.7.2.1 Dry Exhaust Systems
3.7.2.2 Wet Exhaust Systems
3.8 FUME HOOD EXHAUST SYSTEMS
3.8.1 GENERAL
3.8.2 SPECIAL REQUIREMENTS
3.8.3 COMPLIANCE
3.8.4 BASIS OF DESIGN (H3 AND H7 HOODS)
3.8.4.1 General
3.8.4.2 Specific Requirements
3.8.5 H14 HOODS
3.8.6 EXHAUST AIR VOLUME
3.8.7 EXHAUST SYSTEM DESIGN
3.8.7.1 Constant Volume (CV) Design
3.8.7.2 Variable Air Volume (VAV) Hoods (General Purpose and Chemical
Hoods and Radioisotope Hoods Only)
3.9 BIOLOGICAL SAFETY CABINETS (BSC)
3.9.1 COMPLIANCE
3.9.2 CABINET CLASSIFICATION
3.9.2.1 Class I Cabinets
3.9.2.2 Class II Cabinets
3.9.3 BIOLOGICAL SAFETY LEVEL 3 (BSL3)
3.10 DESIGN CRITERIA – AIR DISTRIBUTION SYSTEMS
3.10.1 DUCT DESIGN – GENERAL
3.10.1.1 Compliance
3.10.1.2 Duct Materials
3.10.1.3 Duct Selection Criteria
3.10.1.4 Mandatory Requirement
3.10.1.5 Duct Pressure Classification
3.10.1.6 Flexible Ducts
3.10.1.7 Underground Ducts
3.10.1.8 Shielded Ducts
3.10.1.9 Minimum Duct Size
3.10.2 LIMITING DUCT SIZING PARAMETERS
APPENDIX 3-A: BIO-SAFETY LEVEL 3 (BSL3) FACILITIES
CHAPTER 4: BUILDING COOLING AND HEATING SYSTEM
4.1 INTRODUCTION
4.2 COOLING SYSTEMS – CHILLED WATER
4.2.1 CENTRAL CHILLED WATER PLANTS and SMALL CHILLED WATER
SYSTEMS
4.2.1.1 General
4.2.1.2 Chilled Water Optimization Study – Central Plants and Small Systems
4.2.1.3 Central Chilled Water Plant Sizing
4.2.1.4 Maximum Chiller Capacity
4.2.1.5 Standby Chiller Capacity
4.2.1.6 Small Chilled Water Systems
4.2.1.7 Minimum System Volume – Small Chilled Water Systems
4.2.1.8 Minimum Performance Compliance (ASHRAE Standard 90.1 – 2007)
4.2.2 CHILLED WATER SYSTEM COMPONENTS
4.2.2.1 Chilled and Condenser Water Pumps
4.2.2.2 Cooling Towers
4.2.2.3 Water Treatment – Chilled Water System
4.2.2.4 Water Treatment – Condenser Water System
4.2.3 PIPING AND PUMPING ARRANGEMENT
4.2.3.1 Constant Volume System
4.2.3.2 Variable Flow Systems – Chilled Water
4.2.4 CHILLED WATER FREEZE PROTECTION – PROPYLENE GLYCOL
4.2.4.1 VA Policy
4.2.4.2 Freeze Protection Measures
4.3 COOLING SYSTEMS – DIRECT EXPANSION (DX)
4.3.1 GENERAL
4.3.2 SELECTION CRITERIA
4.3.3 DX SYSTEM DESIGN CONSIDERATIONS
4.3.3.1 Refrigerant Piping
4.3.3.2 Multiple Compressors
4.3.3.3 System Controls
4.4 HEATING SYSTEMS
4.4.1 STEAM HEATING SYSTEM
4.4.1.1 General
4.4.1.2 Steam Pressure Classification
4.4.1.3 Steam Pressure Requirements
4.4.1.4 Pressure Reducing Valve (PRV) Stations – Section Guidelines
4.4.1.5 Steam System Components and Procedures
4.4.2 HYDRONIC HOT WATER SYSTEMS
4.4.2.1 General
4.4.2.2 Hot Water Source – Steam
4.4.2.3 Hot Water Source – Hot Water Boilers
4.4.2.4 Hot Water Design Temperature
4.4.2.5 Fuel Selection
4.4.2.6 Hot Water Piping and Pumping
4.4.2.7 Freeze Protection – Hot Water
4.4.2.8 Terminal Units
4.4.3 ELECTRICAL HEATING SYSTEMS
4.4.3.1 General
4.4.3.2 Applications
4.4.3.3. Controls
4.4.4 GAS HEATING SYSTEMS
4.4.4.1 General
4.4.4.2 Applications
4.4.5 GEOTHERMAL HEATING
4.5 DESIGN CRITERIA – PIPING SYSTEMS
4.5.1 PIPE DESIGN – GENERAL
4.5.1.1 Pipe Selection Criteria
4.5.1.2 Minimum Pipe Size
4.5.1.3 Mandatory Requirements
4.5.1.4 Miscellaneous Requirements
4.5.2 LIMITING PIPE SIZING PARAMETERS
APPENDIX 4-A: PROPYLENE GLYCOL – WATER SOLUTION
CHAPTER 5: AUTOMATIC TEMPERATURE CONTROLS
5.1 GENERAL
5.2 BASIC DESIGN
5.2.1 NEW FACILITY OR RENOVATION
5.2.1.1 Option 1
5.2.1.2 Option 2
5.2.1.3 Option 3
5.2.1.4 Option 4
5.2.1.5 Option 5
5.3 BACNET CONTROLLER IDENTIFICATION
5.4 SPECIFIC REQUIRMENTS
5.4.1 CONTROL ACTUATORS
5.4.2 CONTROL VALVES
5.4.3 CONTROL DAMPERS
5.4.4 END-SWITCHES
5.4.5 SAFETIES
5.4.6 CONTROL WIRING
5.4.7 AIR FLOW MEASURING STATIONS
5.4.8 PERSONAL COMPUTER (PC)
5.4.9 LAPTOP COMPUTER
5.4.10 SOFTWARE
5.4.11 COLOR GRAPHICS
5.4.12 SPREADSHEETS
5.4.13 SECURITY
5.4.14 STATUS MONITORING
5.4.15 ROOM TEMPERATURE SENSORS
5.5 HUMIDITY SENSORS
5.5.1 METERING REQUIREMENTS
5.6 SYSTEM APPLICATIONS
5.6.1 GENERAL
5.6.2 AIRESIDE CONTROLS
5.6.2.1 Air-Handling Units
5.6.2.2 Individual Room Temperature or Pressure Control
5.6.3 HEATING SYSTEM CONTROLS
5.6.4 CHILLED WATER SYSTEM CONTROLS
5.6.5 NON-DDC CONTROLS
5.7 DOCUMENTATION REQUIREMENTS
5.7.1 SCHEMATIC DIAGRAM AND CONTROL SEQUENCE
5.7.2 POINT LIST
CHAPTER 6: APPLICATIONS
6.1 GENERAL
6.2 DEDICATED AIR-HANDLING UNITS
6.3 COMMON (NON-DEDICATED) AIR-HANDLING UNITS
6.3.1 COMMON ROOMS
6.3.1.1 Patient Examination, Treatment, and Procedure Rooms
6.3.1.2 Non- Patient Rooms – Support Areas
6.3.1.3 Non Patient Rooms – Miscellaneous Areas
6.4 GENERAL NOTES
6.4.1 INDOOR DESIGN CONDITIONS
6.4.1.1 Common Design Conditions
6.4.2 AIR BALANCE
6.4.2.1 Definitions
6.4.2.2 Design Considerations
6.4.3 INDIVIDUAL ROOM CONTROL
6.4.3.1 Individual Room Control
6.4.4 EXHAUST CLASSIFICATION AND DESIGNATION
ROOM DATA SHEETS
DEDICATED AHU SYSTEM DATA SHEETS AND ROOM DATA SHEETS
ANIMAL RESEARCH AND HOLDING AREAS – AIR HANDLING UNIT
AHU System Data Sheet
ANIMAL RESEARCH AND HOLDING AREAS – ROOM DATA SHEET
Animal Receiving and Examination Room
Animal Room (Cubical Housing)
Animal Room (Large Animal Room)
Animal Room (Small Animal Room)
Animal Treatment Room
Cage Wash Room
Cage Wash Room (with Tunnel Washer)
Carcass and Waste Storage
Clean Cage Storage Room
Cold Room
Diagnostic Laboratory
Diet Kitchen
Dry Feed and Bed Storage
Environmental Laboratory
Equipment Storage
Hazardous Waste Disposal Room
Incinerator Room
Necropsy
Procedural Laboratory (Barrier Suite)
Procedural Laboratory (Chemical/Radioisotope)
Procedural Laboratory (Infectious Disease)
Procedural Laboratory (Standard)
Quarantine Room
ANIMAL SURGICAL SUITE AND RABBIT HOLDING AREAS – ROOM DATA SHEET
Animal Operating Room (Survival)
Animal Operating Room (Terminal)
Animal Surgical Preparation Room
Control Booth
Corridors
Dark Room
Holding Area – Rabbits
Post Operative Intensive Care
Radiographic Room
Scrub and Gown
Surgical Work and Supply
ATRIUM – AIR HANDLING UNIT
AHU System Data Sheet
AUDITORIUMS AND THEATERS – AIR HANDLING UNIT
AHU System Data Sheet
AUTOPSY SUITE – AIR HANDLING UNIT
AHU System Data Sheet
AUTOPSY – ROOM DATA SHEET
Autopsy Room
Gross Specimen Storage Room
Non-Refrigerated Body-Holding Room
DINING AREA (CAFETERIA) – AIR HANDLING UNIT
AHU System Data Sheet
EMERGENCY CARE UNIT – AIR HANDLING UNIT
AHU System Data Sheet
EMERGENCY CARE UNIT – ROOM DATA SHEET
Emergency Waiting Room
Examination Room
Life Support Unit
Nurses Station
Observation/Treatment
GYMNASIUM – AIR HANDLING UNIT
AHU System Data Sheet
IMAGING SERIES – AIR HANDLING UNIT
AHU System Data Sheet
IMAGING SERIES (MRI UNIT) – ROOM DATA SHEET
MRI Control Room
MRI Scanning Room
MRI Systems Component Room
MRI Visiting Area
IMAGING SERIES (NUCLEAR MEDICINE SERVICES) – ROOM DATA SHEET
Bone Densitometry Room
Nuclear Medicine Scanning Room (Patient Examination Room)
Nuclear Pharmacy Laboratory (Hot Laboratory) Storage and
Preparation Area
Patient Dose Administration
PET/CT Control
PET/CT Scanning Room
PET/CT System Component Room
IMAGING SERIES (RADIATION THERAPY SERVICES) – ROOM DATA SHEET
CT Simulator Control Area
CT Simulator Unit Room
Linear Accelerator Room/Control Area
Treatment Planning Computer Room - Dosimetry Room
Ultrasound Planning Unit Room
IMAGING SERIES (RADIOLOGY SERVICES) – ROOM DATA SHEET
CT Area - Control Room
CT Area - Scanning Room
IR Area - Special Procedure (SP) Control Room
IR Area - SP Room
IR Area - SP System Component Room
Patient Area - Chest Room
Patient Area - General Purpose Radiology Room
Patient Area - Mammography Room
Patient Area - Radiographic/Fluoroscopic Room
Patient Area - Ultrasound Room
Radiology Waiting Room
KITCHEN (FOOD PRODUCTION) – AIR HANDLING UNIT
AHU System Data Sheet
LABORATORIES – AIR HANDLING UNIT
AHU System Data Sheet
LABORATORIES – ROOM DATA SHEET
Bacteriology
Biochemistry
Cytology
Dry Laboratories
Glass Washing
Histology
Media Transfer
Microbiology
Pathology
Serology
Sterilizing
MAIN COMPUTER ROOM - AIR CONDITIONING UNIT (CRAC Units)
AHU System Data Sheet
MAIN ENTRANCE LOBBY - AIR HANDLING UNIT
AHU System Data Sheet
NURSING WING - AIR HANDLING UNIT
AHU System Data Sheet
NURSING WING - ROOM DATA SHEET
Intensive Care Units (ICU)
Litter Bath
Nurses Station
Patient Bedrooms
Patient Bedrooms (Acute Respiratory)
Patient Bedrooms (Psychiatric Ward)
Toilets - Patients (Interior)
Toilets - Patients (Perimeter)
PHARMACY SERVICE - AIR HANDLING UNIT
AHU System Data Sheet
PHARMACY SERVICE - ROOM DATA SHEET
Ante Room (Hazardous Clean Room)
Ante Room (Non-Hazardous Clean Room)
Clean Room (Hazardous Applications)
Clean Room (Non-Hazardous Applications)
Controlled Substance Vault and Secured Dispensing/Receiving
Area
Dispensing, Pre-Packing, and EXTEMP
Drug Information Service
EXTEMP Repacking and Compounding
Medicine Assignment and Stat Counter
Prescription Receiving, Filling Assembly
Production Area – CMOP
Unit Dose and Ward Stock
SPINAL CORD INJURY/DISORDERS CENTER - AIR HANDLING UNIT
AHU System Data Sheet
SPINAL CORD INJURY/DISORDERS CENTER - ROOM DATA SHEET
Activities of Daily Living
Activities of Daily Living - Toilet
Acute Care Ante Room
Acute Care Isolation - Negative Air Balance
Acute Care Isolation - Positive Air Balance
Acute Care One Bedroom
Acute Care Two Bedroom
Acute Respiratory One Bedroom
Corridor
Day Room/Lounge
Home Environment Learning
Bathroom
Bedroom
Kitchen
Living/Dining
Hydrotherapy/Tubroom
Internet Cafe
Litter Storage
Main Entrance and Canopy Section
Multipurpose Room
Nourishment Kitchen
Nurse Station/Ward Clerk
Outpatient Urodynamics Clinic Clean Utility Room
Patient (Litter) Bathroom
Resident Dining/Serving
Resident Storage
Spinal Cord Injury/Disorders - Long Term Care
Computer Lab
(On Unit) Resident Dining Serving
One-Bed Room
PET/KT/OT Clinic
Recreation Therapy
Special Care Room
Two-Bed Room
Visitor Lounge
Therapeutic Pool
Therapeutic Pool - Female Dressing Room
Therapeutic Pool - Male Dressing Room
Therapy Rooms
Kinesiotherapy Treatment Clinic
Occupational Therapy
Physical/Kinesiology Therapy 30 Beds
Physical/Kinesiology Therapy 60 Beds
Physical Therapy Treatment Clinic
Transfer Equipment Storage
Urodynamic Rooms
Cystoscopy/Lithotripsy
Dressing Room/Cubicle
Exam/Treatment Room
Instrument Cleaning Room
Nurse Station
Recovery Room
Storage Room
Urologist Office
STANDALONE SMOKING FACILITY - AIR HANDLING UNIT
AHU System Data Sheet
SUPPLY PROCESSING AND DISTRIBUTION (SPD) - AIR HANDLING UNIT
AHU System Data Sheet
SPD CLEAN - ROOM DATA SHEET
Ante Room
Assistant Chief
Bulk Storage
Case Cart Holding
Chief
Clean HAC
Clean Lockers – Men
Clean Lockers – Women
Clean Toilet/Showers – Men
Clean Toilet/Showers – Women
Dispatch Area
ETO Sterilizer/Aerator Room
First Clerk Office
Non Sterile Storage
PPE
Preparation, Assembly, and Sterilization Area
Receiving & Breakout
Satellite SPD Storage
Scope Storage Room
Staff Breakroom/Conference
Sterile Storage
SPD SOILED (DIRTY) - ROOM DATA SHEET
Automatic Cart Washer
Decontamination Ante Room
Decontamination Area
Decontamination HAC
Decontamination Lockers/PPE Ante Room
Decontamination Lockers – Men
Decontamination Lockers – Women
Decontamination Toilet/Shower – Men
Decontamination Toilet/Shower – Women
Detergent and Water Treatment
Endoscope Processing/High Level Disinfection
Manual Equipment Wash
Sterilizer Equipment Room
SURGICAL SUITE - AIR HANDLING UNIT
AHU System Data Sheet
SURGICAL SUITE - ROOM DATA SHEET
Anesthesia Workroom & Equipment
Clean Core
Controls & Communication Center
Cystoscopic Rooms
Frozen Section Laboratories
Gas Cylinder Storage Room
Heart Lung Machine Preparation
Instrument Preparation and Storage
Nerve Block Induction Room
Operating Rooms
Plaster Splint Storage
Post Anesthesia Care Unit (PACU)
Radiographic Film Processing Room
Semi-Restricted Corridor
Soiled Holding/Disposal Room
Sub-Sterile Room
COMMON (NON-DEDICATED AHU) ROOM DATA SHEETS
PATIENT EXAMINATION, TREATMENT, AND PROCEDURE ROOMS - ROOM DATA SHEET
Audiology Office/Therapy Room
Audiometric
Blood Draw Room
Bone Marrow Transplant (BMT) Suite
Donors Room
Medication Preparation Room
Patient Rooms
Recovery Rooms
Dental Suite
Ceramic Room
Oral Surgery Recovery Room
Oral Surgery Room
Prosthetic Laboratory
Treatment Operatory
Examination Rooms
Isolation Rooms
Airborne Infection Isolation (AII) (Negative Air Pressure)
AII Ante Room (Optional)
AII Isolation Room
Combination Airborne Infection Isolation/Protective Environment
(AII/PE)
AII/PE Ante Room
AII/PE Isolation Room
Protective Environment (PE) (Positive Air Pressure)
PE Ante Room (Optional)
PE Isolation Room
Orthopedic Clinic (Cast Room)
Procedure Room/Class A Operating
Pulmonary Exercise Room
Special Procedure Rooms
Aerosolized Pentamidine
Bronchoscopy
Cardiac Catheterization
Colonoscopy/EGD
Cystoscopy
Endoscopy
Fluoroscopy
Gastrointestinal
Proctoscopy
Sigmoidoscopy
Sputum Collection
Therapy Rooms
Hydrotherapy/Therapeutic Pool
Kinesiotherapy
Occupational Therapy
Physical Therapy
Treatment Rooms
Chemotherapy
Dermatology
Phototherapy/Shower Room
Tub Room
Ventilatory Test Room
Visual Field/Photography Room
Vital Signs Station
NON PATIENT ROOMS - SUPPORT AREAS - ROOM DATA SHEET
Admission and Main Waiting
Barber Shop
Chapel
Class Room
Conference Room
Corridors
Dressing Room
Gift Shop (Retail Store)
Library
Locker Room (with Toilets)
Locker Room (without Toilets)
Lounge
Medical Media Service (MMS)
Audio Visual Storage/Checkout
Camera Copy
Client Review Room
Computer Imaging System Network
Darkroom (Printing/Enlarging)
Expanded Core - Illustration Room
Expanded Core - Stat Camera
Photo Finishing
Photo Studio/Audio Visual Recording
Photomicrography
Video Editing CCTV Control Room
Medical Records
Medication Room
Multipurpose Room
offices
Pool Dressing/Toilet/Shower-Male/Female
Toilets - Public (Interior)
Toilets - Public (Perimeter)
NON PATIENT ROOMS - MISCELLANEOUS AREAS - ROOM DATA SHEET
Attic Space
Audiology Instrument Calibration and Repair Shop
Battery Charging Room
Biomedical Instrument Repair Shop
Clean Utility/Storage Room
Computer Lab Room
Copy/Printing Room (Large)
Copy/Printing Room (Small)
Crawl Space (Pipe Basement)
Electrical Equipment Rooms (EER)
Electrical Equipment Closets without Internal Heat Gain
Satellite and Main Electrical Rooms with Internal Heat Gain
Elevator Machine Room
Engineering Control Center Room
Engineering Shops (Maintenance)
Exterior Stairs
Housekeeping Aid Closet (HAC)
Kitchenette
Litter Storage
Loading Dock
Maintenance Garages
Mechanical Equipment Rooms (MER)
Air Handling Equipment Rooms
Heating Rooms
Refrigeration Equipment Rooms
Reagent Grade Water Treatment Room
Soiled Utility and Storage Room
Standby Generator Room
Trash Collection Room
Vestibules
Walk-in Refrigerator and Freezers
Warehouse (Central) with Pharmacy
CHAPTER 7: CLIMATIC DATA
Table 7-1: CLIMATIC CONDITIONS
Table 7-2: HIGH HUMIDITY LOCATIONS
Table 7-3: LOW HUMIDITY LOCATIONS
CHAPTER 8: ABBREVIATIONS AND REFERENCES
8.1 ABBREVIATIONS
8.2 REFERENCES